Services
Cost Planning
Advise on the economics of a project and preparation of a budget and preparation of Cost Plans, generally based on El¬emental Preliminary Estimates

A budget normally does not tell a Client or the Design team how the entire amount or less could be spent effectively and efficiently on a built facility. Adding Micro-Level control points to the project helps the design team in ensuring that the right amount is spent on the right element of the built facility without compromising both the budget and the overall intended functions.

CCS is at the forefront in providing a complete budget breakdown on an Elemental basis and thus enabling a smooth and unhindered decision making process during the design phase.